Planning power for pool equipment
A pool needs power for its pumps, lights and possibly a heat pump. Agreeing what is needed before building avoids surprises at the board.
A new pool adds several electrical loads: the circulation pump, any feature or booster pumps, lighting, chlorination and controls, and often a heat and cool unit that can be the largest single load. The villa’s supply and distribution board must be able to take these, and cables need routes to the plant.
Construction guides follow a new pool from the first idea to the first swim, so each stage is easier to plan and to question.
The pool contractor provides the equipment list and ratings; the electrician plans the supply, protection, isolation and earthing that pool installations require. Doing this during design means cable ducts can be laid before the deck goes down and the board can be upgraded in good time if needed.
01Summary
What matters most here
List every load
Pumps, lights, controls and heat pump.
Check supply capacity
The heat pump may be the biggest load.
Lay ducts early
Before the deck is built.
02Detail
What the electrician needs
Equipment ratings
Power ratings for each item.
Plant location
And cable route from the board.
Lighting plan
Number and type of lights.
Controls
Timers, automation and remote control requirements.
03Before you start
During design
Share the equipment list
With the electrician.
Plan cable ducts
Under the deck.
Check the board
For space and capacity.
—In practice
How to use this
Get the electrical requirements for every planned piece of equipment — pumps, lighting, chlorination, controls and any heat and cool unit — and give the list to the villa’s electrician before construction starts. The electrician checks supply and board capacity, plans circuits and protection, and agrees cable routes so ducts go in before the deck is laid.
Mistakes worth avoiding
- Leaving power until the end
- If capacity or cable routes are unresolved at commissioning, the pool is finished but cannot run its equipment.
- Forgetting a future heat pump
- Temperature control is often the largest load. Plan the supply now, even if the unit itself is installed later.
04FAQ
Common questions about this
- Does a heat pump need its own circuit?
- Usually, sized for its rating; the electrician confirms.
- Why plan ducts before decking?
- Laying cables later means lifting the deck.
- Who does the electrical work?
- A qualified electrician, coordinated with the pool contractor.
- What if the board is full?
- It may need upgrading or a sub-board; this is planned early.
05Read next
More pool guides on this
- Fitting a pool into a small gardenAnother stage of planning and building a pool.
- Building a pool on a roof or terraceAnother stage of planning and building a pool.
- Designing a pool for young childrenA related design decision.
- Planning shade and sun around a poolA related design decision.
Filed under new pool construction. Every pool guide is listed on the pool guides page.
—NEXT
Planning equipment?
Tell us what you want installed. We will provide the equipment list for your electrician.